Extensive repairs have been carried out including:
Ø
Installed 10 new pier legs, with large M24 x 650mm galvanised bolts
specially manufactured,
Ø
Replaced all roadway timbers, this required over 3,500 x 180mm M12
galvanised coach screws to be installed!!,
Ø
Replaced all handrail posts (50) and rails, made to original design.
Each post is held on with M24 galv bolts, plus new galvanised saddles,
Ø
Restoration
of one of the original waiting rooms,
Ø
Installation of two ladders, plus a set of steps.
As purchased in 2007, many legs missing |
Spring 2014, new legs and cross braces in place.
|
2012, new legs and ladder in place. |
View to shore in 2014 with restored building. |
|
|
.
|