Extensive repairs have been carried out including:

Ø  Installed 10 new pier legs, with large M24 x 650mm galvanised bolts specially manufactured,

Ø  Replaced all roadway timbers, this required over 3,500 x 180mm M12 galvanised coach screws to be installed!!,

Ø  Replaced all handrail posts (50) and rails, made to original design.  Each post is held on with M24 galv bolts, plus new galvanised saddles,

Ø  Restoration of one of the original waiting rooms,

Ø  Installation of two ladders, plus a set of steps.

As purchased in 2007, many legs missing

 

Spring 2014, new legs and cross braces in place.

 

2012, new legs and ladder in place.

View to shore in 2014 with restored building.

   


.

 

     