Extensive repairs have been carried out including:
Ø Installed 10 new pier legs, with large M24 x 650mm galvanised bolts specially manufactured,
Ø Replaced all roadway timbers, this required over 3,500 x 180mm M12 galvanised coach screws to be installed!!,
Ø Replaced all handrail posts (50) and rails, made to original design. Each post is held on with M24 galv bolts, plus new galvanised saddles,
Ø Restoration of one of the original waiting rooms,
Ø Installation of two ladders, plus a set of steps.